Degassing is performed in the degassing chamber after putting the tray loaded with the cell. After that, final sealing, cutting, testing and unloading the OK cell. There are one side cell dedicated line and both side cell dedicated line.
UNIT : Loading, Degassing1, Degassing 2, Final Sealing, Unloading
Production Speed | 10 ~ 15 PPM | |
---|---|---|
Cell Size (mm) | Length | 100 ~ 200 |
Width | 120 ~ 250 | |
Height | 3 ~ 12 | |
Capacity | 20 ~ 50 Ah | |
Option | Siemens PLC, CE Mark, UL Mark |